Skip to content

REVIEW — TFW-42 / Phase C: Glossary & Adapter Sync

Date: 2026-04-30 Author: Reviewer (Antigravity) Verdict: ✅ APPROVE Review Mode: docs RF: RF Phase C TS: TS Phase C Stage files: review/map.md, review/verify.md, review/judge.md This file is a synthesis of stage findings. Reference stage files for raw evidence.


1. Map

The executor updated 3 glossary entries to reflect the new research/iterN/ folder structure and co-located RES.md convention from Phase A. Added agent (free-text) and sources (list) as optional fields in the iterations.yaml glossary entry. Synced 4 adapter workflow copies (2 Antigravity + 2 Claude Code) to match Phase B source files — the TS §4 table listed only 2, but AC-2 explicitly required checking all adapter directories, which the executor identified and handled via ONB §4 Recommendation #1. Bumped VERSION to 0.8.6 and recorded all 3 phases in a consolidated CHANGELOG entry with phase attribution tags.

2. Verify

# What was checked Result Evidence
1 Glossary entries (3 entries, 4 grep gates) V1: researchN/, RES__iter, at task root, PhaseA — all 0 matches
2 Adapter sync: .agent/workflows/tfw-research.md V2: Compare-Object — 0 differences
3 Adapter sync: .agent/workflows/tfw-plan.md V8: Compare-Object — 0 differences
4 Adapter sync: .claude/commands/tfw-research.md V7: Compare-Object — 0 differences
5 Adapter sync: .claude/commands/tfw-plan.md V3: Compare-Object — 0 differences
6 VERSION file V4: 0.8.6 confirmed
7 CHANGELOG.md ⚠️ V5: [0.8.6] section present, 9 items (RF says "10" — minor narrative error)
8 project_config.yaml version V6: version: "0.8.6" confirmed

All 8 claimed files verified (100%). One cosmetic discrepancy: RF narrative says "10 changelog items" but actual count is 9. Not a DoD violation.

3. Judge

# Check Status Evidence
1 DoD met? (all TS acceptance criteria) AC-1: 4 greps clean, glossary text matches conventions.md §4. AC-2: 4/4 adapter pairs identical. AC-3: 3/3 version locations match
2 Philosophy aligned (matches HL design philosophy) P1 (locality): research/iterN/ paths. P3 (container): no researchN/. P5 (optional): agent/sources optional. P7 (tool-agnostic): no brand names
3 Tech debt documented 2 observations carried from Phase B (TD-111, TD-112) — PascalCase remnants in compilable_contract.md and handoff.md
4 Style & standards RF follows template. Naming follows conventions. CHANGELOG uses Keep a Changelog
5 Observations collected 2 carried observations with TD references, both are real issues with specific file/line locations
6 RF completeness (§6-8 present) §6 "No fact candidates" — valid for sync task. §7 "No strategic insights" — valid. §8 "No diagrams" — valid
7 Content quality (docs mode) Glossary entries clear, accurate, cross-referenced. CHANGELOG comprehensive with phase attribution
8 Source verification (docs mode) Glossary text matches conventions.md §4 (source of truth). Adapter copies verified byte-identical

4. Verdict

✅ APPROVE

All 3 acceptance criteria are met. Glossary entries accurately reflect the new folder structure. All 4 adapter copies are byte-identical to their source workflows. Version 0.8.6 is consistent across VERSION, CHANGELOG, and project_config.yaml. The executor correctly identified and synced 4 adapter copies (not 2 as TS §4 table suggested) per AC-2's explicit directive — good judgment. The minor discrepancy (RF says "10 items", actual is 9) is a narrative counting error that does not affect deliverable quality.

This completes TFW-42 across all 3 phases.

5. Tech Debt Collected

Source format: Use reference patterns (compilable_contract.md §2).

# Source Severity File Description Action
1 RF TFW-42/C obs. #1 (carry from TD-112) Med .tfw/workflows/handoff.md L140-144 Multi-Phase Task Flow example uses HL__PhaseA, TS__PhaseA, RF__PhaseA — needs kebab-case update → backlog (TD-112 already tracked)
2 RF TFW-42/C obs. #2 (carry from TD-111) Med .tfw/compilable_contract.md L56, L78 References PhaseA/ in resolution rules — will break on kebab-case convention → backlog (TD-111 already tracked)

Both items are already tracked in TECH_DEBT.md (TD-111, TD-112). No new tech debt items. Quality filter: both are legitimate naming inconsistencies that will cause confusion for agents navigating these files.

6. Traces Updated

  • [ ] README Task Board — status updated
  • [ ] HL status — updated if phase completes
  • [x] project_config.yaml — initial_seq: no increment needed (no new tasks created)
  • [x] Other project files — checked for stale info (KNOWLEDGE.md D38 still references researchN/ — expected, will be updated via tfw-docs)
  • [ ] tfw-docs: Deferred — pending user trigger
  • [ ] tfw-knowledge: N/A (no fact candidates in RF/REVIEW)

7. Fact Candidates

No fact candidates. This was a mechanical sync task — no domain insights or strategic knowledge emerged.


REVIEW — TFW-42 / Phase C: Glossary & Adapter Sync | 2026-04-30