Skip to content

RF — TFW-46 / Phase C: Glossary + Adapters + Version

Date: 2026-07-07 Author: Executor (Antigravity, Claude Opus 4.6) Status: 🟢 RF — Complete Parent HL: HL-TFW-46 TS: TS Phase C ONB: ONB Phase C


1. What Was Done

Evidence Layer Phase C: finalized TFW-46 by adding 5 Evidence terms to the glossary, fixing TD-118 stale reference, syncing 6 adapter workflow copies (3 Antigravity + 3 Claude Code), bumping VERSION to 0.8.8, writing the CHANGELOG entry covering all three phases, and closing 3 tech debt items (TD-111, TD-112, TD-117) in a KNW cleanup pass.

Modified Files

# File Change
1 glossary.md New ## Evidence Terms section with 5 entries (Evidence, Evidence Plan, Evidence Collection, Evidence Audit, Evidence Status Vocabulary). Fixed TD-2: Strategic Insight RF §7RF §8
2 .agent/workflows/tfw-handoff.md Synced from canonical .tfw/workflows/handoff.md (Phase A+B changes)
3 .agent/workflows/tfw-review.md Synced from canonical .tfw/workflows/review.md (Phase A+B changes)
4 .agent/workflows/tfw-plan.md Synced from canonical .tfw/workflows/plan.md (Phase B changes)
5 .claude/commands/tfw-handoff.md Synced from canonical .tfw/workflows/handoff.md
6 .claude/commands/tfw-review.md Synced from canonical .tfw/workflows/review.md
7 .claude/commands/tfw-plan.md Synced from canonical .tfw/workflows/plan.md
8 VERSION 0.8.7 → 0.8.8
9 CHANGELOG.md New [0.8.8] entry with Added (9 items) and Changed (3 items) sections covering TFW-46 Phases A, B, C
10 README.md Task Board: Phase C TS and ONB links added
11 compilable_contract.md TD-111: PhaseA/phase-a/ in resolution rules (L56, L78). TD-117: REVIEW.md §5 FC§7 FC (L69)
12 handoff.md TD-112: Multi-Phase Task Flow example: HL__PhaseA + TS__PhaseATS__phase-a (kebab-case, removed stale per-phase HL refs)
13 TECH_DEBT.md TD-111, TD-112, TD-117 marked ✅ Closed

2. Key Decisions

# Decision Rationale
K1 Evidence Status Vocabulary as a separate glossary entry (not inline in Evidence definition) The 4-status vocabulary (VERIFIED/DEFERRED/BLOCKED/N/A) is referenceable independently — reviewers and executors need the status definitions without reading the full Evidence concept. Matches how "Fact Candidate" and "Strategic Insight" are separate entries
K2 CHANGELOG entry references D52 (not yet in KNOWLEDGE.md) Phase C is the last phase — the REVIEW and subsequent tfw-docs will create the D52 entry. The CHANGELOG anticipates the decision number. If the reviewer assigns a different number, the CHANGELOG should be updated
K3 Adapter sync via file copy (not content comparison + selective update) Both .agent and .claude adapters share the same YAML frontmatter + header format as canonical files. Full copy is the established pattern (TFW-42/C, TFW-43). Hash verification confirms byte-identical result
K4 TD cleanup done in KNW phase (not a separate task) 3 small fixes (< 5 min total) in files already touched by Phase C. User explicitly requested "не оставлять грязи" — fixing stale refs during final sync is proportional

3. Acceptance Criteria

  • [x] AC-1: Glossary updated with Evidence terms — 5 new entries under ## Evidence Terms heading: Evidence, Evidence Plan, Evidence Collection, Evidence Audit, Evidence Status Vocabulary. All terms domain-agnostic (no screenshots, browser, curl examples). Cross-references to conventions.md §3. TD-2 fixed: RF §7RF §8 in Strategic Insight entry.
  • [x] AC-2: Adapter workflow copies synced — All 6 pairs verified byte-identical via SHA256 hash comparison: handoff (.agent=True, .claude=True), review (.agent=True, .claude=True), plan (.agent=True, .claude=True).
  • [x] AC-3: Version bump.tfw/VERSION now contains 0.8.8.
  • [x] AC-4: CHANGELOG entry## [0.8.8] — 2026-07-07 with Added (9 items covering Phases A, B, C) and Changed (3 items). References TFW-46 and all three phases. [Unreleased] section remains empty above.

4. Verification

  • Lint (echo "configure your lint command"): N/A (markdown-only changes)
  • Tests (echo "configure your test command"): N/A (no executable tests for .tfw)
  • Verify (echo "configure your verify command"): N/A (no verify command configured)

Manual verification performed: 1. glossary.md: 5 Evidence terms present, no domain-specific examples, cross-references to conventions.md §3 2. glossary.md: Strategic Insight entry now reads RF §8 (was RF §7) 3. Adapter hashes: all 6 pairs confirmed byte-identical (PowerShell Get-FileHash) 4. VERSION: single line 0.8.8 5. CHANGELOG: [0.8.8] entry present with correct date, Added/Changed sections, TFW-46 references

5. Evidence

# AC What was verified Environment Result Artifact
E1 AC-1 5 Evidence terms present in glossary.md under ## Evidence Terms Local file VERIFIED glossary.md lines 58-80
E2 AC-1 TD-118 fixed: RF §7 → §8 in Strategic Insight Local file VERIFIED glossary.md line 48
E3 AC-1 No domain-specific examples in glossary terms Local file, manual review VERIFIED glossary.md lines 58-80 — no mentions of screenshots, browser, curl
E4 AC-2 All 6 adapter copies byte-identical with canonical sources PowerShell Get-FileHash VERIFIED Hash comparison output: handoff=True, review=True, plan=True (both .agent and .claude)
E5 AC-3 VERSION contains 0.8.8 Local file VERIFIED .tfw/VERSION line 1
E6 AC-4 CHANGELOG [0.8.8] entry present with correct structure Local file VERIFIED .tfw/CHANGELOG.md lines 8-22
E7 AC-4 [Unreleased] section still present Local file VERIFIED .tfw/CHANGELOG.md line 6
E8 TD-111 compilable_contract.md L56 now reads phase-a/ (was PhaseA/) Local file VERIFIED compilable_contract.md line 56
E9 TD-111 compilable_contract.md L78 now reads phase-a/ (was PhaseA/) Local file VERIFIED compilable_contract.md line 78
E10 TD-112 handoff.md Multi-Phase Task Flow uses TS__phase-a, RF__phase-a Local file VERIFIED handoff.md lines 148-153
E11 TD-117 compilable_contract.md L69 now reads §7 FC (was §5 FC) Local file VERIFIED compilable_contract.md line 69
E12 TD-112 Handoff adapters re-synced after TD-112 fix PowerShell Get-FileHash VERIFIED handoff: .agent=True, .claude=True

Evidence verdict: 12/12 VERIFIED, 0 DEFERRED, 0 BLOCKED, 0 N/A

6. Observations (out-of-scope, not modified)

No observations. All stale references found during Phase C have been fixed (TD-111, TD-112, TD-117, TD-118).

7. Fact Candidates

No fact candidates.

8. Strategic Insights (Execution)

No strategic insights.

9. Diagrams

No diagrams.


RF — TFW-46 / Phase C: Glossary + Adapters + Version | 2026-07-07