1. Map¶
Phase B integrated the Evidence concept into TFW's three lifecycle workflows: handoff.md (new Step 11 "Collect evidence" between build gate and Pre-RF Gate, step renumbering 11-12 → 12-13, §5 Evidence in mandatory sections), review.md (2 new Trust Protocol entries for evidence claims, Step 3 evidence audit reference), plan.md (3-line coordinator reminder for Evidence fields in Step 7), and RF.md (TD-1 fix from Phase A). 4 workflow files modified + README Task Board. Scope well-bounded, no overreach.
2. Verify¶
| # | What was checked | Result | Evidence |
|---|---|---|---|
| 1 | handoff.md Step 11 content, placement, numbering | ✅ | Step 11 at lines 85-90, proportionality clause, DEFERRED/BLOCKED, no tool names. Steps 12-13 renumbered. §5 in mandatory list. Never omit §5. — V1 |
| 2 | review.md Trust Protocol entries | ✅ | 2 new entries (lines 45-46), correct trust levels (Verify/Challenge), existing 7 entries unchanged. Total: 9 — V2 |
| 3 | plan.md Evidence reminder | ✅ | Sub-step 3 (lines 125-127), 3 lines, references TS template grammar, proportionality note. Placed after budget check — V3 |
| 4 | RF.md TD-1 fix | ✅ | Line 68: §6 Observations (was §5 Observations) — V4 |
| 5 | README Task Board | ✅ | TFW-46 row updated with Phase B links — V5 |
| 6 | Knowledge Citations (5/11 spot-checked) | ✅ | K1, K3, K7, K9, K10 all resolve to real items — verify.md |
| 7 | Evidence artifacts (7/7 line refs) | ✅ | All line references match actual file content — verify.md E1-E7 |
Raw verification log: see
review/verify.md. 100% file verification (5/5 files checked). 0 discrepancies found.
3. Judge¶
| # | Check | Status | Evidence |
|---|---|---|---|
| 1 | DoD met? (all TS acceptance criteria) | ✅ | 5/5 ACs verified — V1-V5. All AC-1 sub-criteria (10 items) confirmed. AC dependency respected |
| 2 | Philosophy aligned (matches HL design philosophy) | ✅ | All 7 HL principles verified — judge.md §3 Principles Check |
| 3 | Tech debt documented | ✅ | RF §6: 2 substantive observations |
| 4 | Style & standards | ✅ | Step density, Trust Protocol pattern, sub-step numbering — all follow existing conventions |
| 5 | Observations collected | ✅ | 2 real issues, no filler |
| 6 | RF completeness (§7-9 present) | ✅ | §7-9 present with explicit N/A per F21 |
| 7 | Evidence completeness | ✅ | All TS Evidence fields N/A (workflow spec — appropriate). RF §5: 7/7 VERIFIED |
| 8 | Code quality | ✅ | Markdown conventions followed |
| 9 | Test coverage | N/A | No executable tests for .tfw/ |
| 10 | Security | ✅ | No secrets, no external URLs |
| 11 | Breaking changes | ✅ | Additive — step renumbering, new Trust Protocol entries, no backward incompatibility |
4. Verdict¶
✅ APPROVE
Phase B delivers what the TS specified: Evidence lifecycle is now active end-to-end across coordinator (plan.md reminder) → executor (handoff.md Step 11) → reviewer (review.md Trust Protocol + Step 3 reference). All 5 ACs met, all 7 HL principles enforced. The work is precise — Step 11 matches existing step density, Trust Protocol entries follow the established pattern, and the plan.md reminder is a pointer without duplication.
No discrepancies found. TD-1 from Phase A is fixed. The two observations (plan.md numbering confusion, glossary stale ref) are pre-existing issues properly routed to Phase C.
5. Tech Debt Collected¶
| # | Source | Severity | File | Description | Action |
|---|---|---|---|---|---|
| TD-1 | RF obs #1 | Low | plan.md line 130 |
Sub-step numbering mix: budget=2, evidence=3, then 3a for TS writing. Pre-existing pattern, not introduced by this change | → backlog |
| TD-2 | RF obs #2 | Low | glossary.md line 48 |
Stale: RF §7 "Strategic Insights" should be RF §8 after Phase A renumbering. Already noted in Phase A RF obs #2 |
→ Phase C (glossary scope) |
6. Traces Updated¶
- [x] README Task Board — status updated (🟢 RF, REVIEW link to be added)
- [x] HL status — Phase B in progress, no HL status change needed
- [x] project_config.yaml — no seq change needed
- [x] Other project files — checked for stale info
- [x] tfw-docs: N/A (workflow instruction changes — no architecture decisions to add to KNOWLEDGE.md)
- [x] tfw-knowledge: N/A (no fact candidates in RF, no new human-sourced knowledge)
7. Fact Candidates¶
No fact candidates. Mechanical workflow integration task with no human domain insights surfaced during review.