ONB — TFW-46 / Phase B: Workflows + Integration

Date: 2026-07-07 Author: Executor (Antigravity, Claude Opus 4.6) Status: 🟠 ONB — Awaiting answers Parent HL: HL-TFW-46 TS: TS Phase B


1. Understanding

Phase B integrates the Evidence concept (established in Phase A's conventions + templates) into TFW's three lifecycle workflows. Specifically: (1) handoff.md gets a new Step 11 (Evidence Collection) between build gate and Pre-RF Gate, with step renumbering 11-12 → 12-13; (2) review.md Trust Protocol gets 2 new evidence-specific entries; (3) plan.md Step 7 gets a coordinator reminder to write Evidence fields in TS AC items; (4) RF.md TD-1 fix (stale §5 Observations§6 Observations). After this phase, the Evidence lifecycle is active end-to-end across coordinator → executor → reviewer.

2. Entry Points

File Current state What changes
.tfw/workflows/handoff.md Steps 7-12, Phase A already updated §refs to §6-9 New Step 11 inserted, Steps 11-12 → 12-13, §5 Evidence added to mandatory RF sections
.tfw/workflows/review.md Trust Protocol has 7 entries, Step 3 references verify.md 2 new Trust Protocol entries for evidence claims, Step 3 evidence reference
.tfw/workflows/plan.md Step 7 covers TS writing with budget check Brief evidence reminder added
.tfw/templates/RF.md Line 68: §5 Observations (stale) Fix to §6 Observations

3. Questions (blocking — cannot proceed without answers)

# Question Answer
No blocking questions

No blocking questions. The TS is clear, all 5 ACs have precise scope, and the affected files are well-understood from Phase A context.

4. Recommendations (suggestions, not blocking)

  1. AC-1 Step 13 Never omit §5. wording: The TS says to add Never omit §5. alongside existing Never omit §7-9. (updated from §6-8). Currently handoff.md line 98 reads Never omit §7-9. I'll update to Never omit §5. Never omit §7-9. to keep them as two separate constraints (Evidence completeness vs Knowledge sections completeness) rather than merging into a range like §5, §7-9 which could confuse the range semantics.

5. Risks Found (edge cases, potential issues not in TS)

  1. handoff.md tip blockquote reference: Line 101 references §7 Fact Candidates in the tip block. After Step renumbering (11→12, 12→13), the tip stays at the same location (after the Create RF step). No content change needed but must verify it doesn't shift during step insertion.
  2. handoff.md Observations Section heading: The inline example (lines 108-125) references ## Observations (out-of-scope, not modified) without a §-number. This is an example block, not a cross-ref — no update needed, but worth noting.

6. Inconsistencies with Code (spec vs reality)

  1. The TS §4 says handoff.md has "Steps 7-12". Actual file has Steps 7 (Update task board), 8 (Implement), 9 (Run tests), 10 (Build gate), 11 (Pre-RF Gate), 12 (Create RF file). Confirmed: 6 numbered steps (7-12) as TS describes. No inconsistency.

7. Knowledge Citations

# HL §7.2 ref Read? Applied / N/A Notes
1 K1: README Values — Honesty Over Convincingness Applied — Step 11 DEFERRED/BLOCKED guidance ensures honest evidence gaps
2 K2: README Values — Structural Enforcement Applied — Evidence artifacts as structural proof in Step 11
3 K3: philosophy.md F4 Applied — Evidence folder pattern referenced in Step 11
4 K4: philosophy.md F21 Applied — DEFERRED/N/A statuses in Step 11 follow explicit N/A pattern
5 K5: philosophy.md F27 N/A — Phase B is workflow text changes, not artifact file creation
6 K6: process.md F14 Applied — Step 11 proportionality clause prevents fast-green
7 K7: conventions.md §12 Applied — Step 11 extends "never claim tested" to require evidence artifacts
8 K8: conventions.md §14 Applied — Step 11 mirrors anti-pattern: "executor writes RF before evidence collected"
9 K9: D41 (TFW-41) Applied — Evidence Plan extends AC gates, Step 11 implements the executor side
10 K10: D46 (TFW-38) Applied — Trust Protocol entries (AC-2) extend D46's Trust Protocol for evidence claims
11 K11: philosophy.md F13 Applied — Step 11 stays domain-agnostic, no tool names

No new PV items found beyond coordinator's K1-K11.