Skip to content

RF โ€” TFW-41 / Phase D: Glossary and Adapter Sync

Date: 2026-04-20 Author: Executor (AI) Status: ๐ŸŸข RF โ€” Complete Parent HL: HL-TFW-41 TS: TS__PhaseD__glossary_and_adapters


1. What Was Done

New Files

File Description
tasks/TFW-41__execution_quality_gates/PhaseD/ONB__PhaseD__glossary_and_adapters.md Onboarding report for Phase D

Modified Files

File Changes
.tfw/glossary.md Added 15 new terms in 2 new sections: ## Execution Gates (10 terms) and ## Research โ€” Dimensional Analysis (5 terms)
.agent/workflows/tfw-handoff.md Synced with source: Step 0 (Session Naming), Execution Loops, Pre-RF Gate, Coordinator ONB answer protocol
.agent/workflows/tfw-plan.md Synced with source: Step 0 (Session Naming), Pre-TS Gate in Step 7 (3b)
.agent/workflows/tfw-review.md Synced with source: Step 0 (Session Naming), step renumbering (Step 1 = Select Review Mode), HL ยง7 Principles check in Step 4 Judge
.agent/workflows/tfw-research.md Synced with source: dimensional analysis thread in Step 5
README.md Task board updated: Phase D TS + ONB links added, status โ†’ ๐ŸŸข RF

2. Key Decisions

  1. 15 terms, not 14. Coordinator confirmed that HL ยง4 deliverables list is the authoritative source and "Alternative" was omitted from TS AC-1 by oversight. Added as the 5th dimensional analysis term. Contract interpretation: TS AC-1 checklist count (14) was supplementary; HL deliverables list (15) takes precedence when user confirms the discrepancy.

  2. Adapter sync = verbatim overwrite. Both source workflows and adapter files carry identical frontmatter (--- block with description:). Copied everything verbatim โ€” no transformation, no merge. Zero risk of missed content vs. a manual merge.

  3. Glossary section placement. ## Execution Gates inserted after ## Roles (before ## RESEARCH) โ€” logical: execution gate terms apply to all roles. ## Research โ€” Dimensional Analysis inserted after ## Read-only AG (before ## Phase) โ€” collocated with existing RESEARCH-related terms. TS ยง6 Technical Guidance suggestion followed.

  4. Definition style conformance. Each term: single paragraph, domain-neutral language, โ†’ file ยงN reference format. Zwicky / GMA / morphological terminology absent from all definitions per conventions.md ยง14.1.

3. Acceptance Criteria

AC-1: Glossary โ€” 15 terms (14 + Alternative)

  • [x] Acceptance Criteria (TS) โ€” added to ## Execution Gates
  • [x] Technical Guidance โ€” added to ## Execution Gates
  • [x] Definition of Failure (TS) โ€” added to ## Execution Gates
  • [x] Principles Check โ€” added to ## Execution Gates
  • [x] AC Dependency Annotation โ€” added to ## Execution Gates
  • [x] Execution Loop โ€” added to ## Execution Gates
  • [x] Pre-TS Gate โ€” added to ## Execution Gates
  • [x] Pre-RF Gate โ€” added to ## Execution Gates
  • [x] Session Naming โ€” added to ## Execution Gates
  • [x] Phase Dependencies โ€” added to ## Execution Gates
  • [x] Dimension (Research) โ€” added to ## Research โ€” Dimensional Analysis
  • [x] Alternative (Research) โ€” added to ## Research โ€” Dimensional Analysis (coordinator-approved addition)
  • [x] Configuration Space (Research) โ€” added to ## Research โ€” Dimensional Analysis
  • [x] Consistency Check (Research) โ€” added to ## Research โ€” Dimensional Analysis
  • [x] Surviving Configuration (Research) โ€” added to ## Research โ€” Dimensional Analysis

Gate verified: glossary.md read after modification โ€” all 15 terms present, each has a concise definition.

AC-2: Adapter sync โ€” Antigravity workflows [depends: AC-1]

Gate: each adapter was written via full overwrite from source content read in this session. No diff exists.

4. Verification

No build/lint commands defined for this task (pure markdown modifications).

Manual verification checklist:

  • [x] glossary.md โ€” 15 terms counted, definitions do not use Zwicky/GMA/morphological terminology
  • [x] glossary.md โ€” all definitions use โ†’ file ยงN reference format consistent with existing entries
  • [x] glossary.md โ€” two new H2 sections: ## Execution Gates, ## Research โ€” Dimensional Analysis
  • [x] tfw-handoff.md โ€” Step 0 present, Execution Loops present (Step 8), Pre-RF Gate present (Step 11), ONB answer protocol present (Step 5 callout), line count matches source (161)
  • [x] tfw-plan.md โ€” Step 0 present, Pre-TS Gate block present in Step 7 (3b), line count matches source (153)
  • [x] tfw-review.md โ€” Step 0 present, Step 1 = Select Review Mode (renumbered), HL ยง7 Principles check in Step 4, line count matches source (153)
  • [x] tfw-research.md โ€” dimensional analysis thread present in Step 5, line count matches source (131)

5. Observations (out-of-scope, not modified)

# File Line(s) Type Description
1 .tfw/templates/research/briefing.md โ€” todo TS ยง6 notes "briefing.md doesn't reference Dimensions section" (Phase C RF ยง5 observation). Low priority โ€” dimensions are naturally discovered during Gather. If future work addresses this, the term "Dimension" is now in the glossary and can be referenced safely.

6. Fact Candidates

# Category Candidate Source Confidence
1 process TS AC-1 checklist (14 terms) diverged from HL ยง4 deliverables list (15 terms, included "Alternative"). User resolved: HL deliverables list is authoritative when user confirms. Pattern: HL = vision, TS = spec; when they diverge, ask user before defaulting to TS. User answer to ONB ยง3.1 High
2 convention "Alternative" term was the only missing link between Dimension and Configuration Space definitions. Without it, a reader of the glossary would understand that Dimensions have alternatives but couldn't find the term "Alternative" defined. Completeness of a term cluster matters. This session, glossary analysis Medium

7. Strategic Insights (Execution)

No strategic insights. This was a documentation-only phase with no human domain knowledge injected beyond resolving the ONB question.

8. Diagrams

No diagrams. Phase D produced no architectural or flow changes โ€” pure text additions (glossary terms + adapter sync).


RF โ€” TFW-41 / Phase D: Glossary and Adapter Sync | 2026-04-20