RF โ TFW-41 / Phase D: Glossary and Adapter Sync¶
Date: 2026-04-20 Author: Executor (AI) Status: ๐ข RF โ Complete Parent HL: HL-TFW-41 TS: TS__PhaseD__glossary_and_adapters
1. What Was Done¶
New Files¶
| File | Description |
|---|---|
tasks/TFW-41__execution_quality_gates/PhaseD/ONB__PhaseD__glossary_and_adapters.md |
Onboarding report for Phase D |
Modified Files¶
| File | Changes |
|---|---|
.tfw/glossary.md |
Added 15 new terms in 2 new sections: ## Execution Gates (10 terms) and ## Research โ Dimensional Analysis (5 terms) |
.agent/workflows/tfw-handoff.md |
Synced with source: Step 0 (Session Naming), Execution Loops, Pre-RF Gate, Coordinator ONB answer protocol |
.agent/workflows/tfw-plan.md |
Synced with source: Step 0 (Session Naming), Pre-TS Gate in Step 7 (3b) |
.agent/workflows/tfw-review.md |
Synced with source: Step 0 (Session Naming), step renumbering (Step 1 = Select Review Mode), HL ยง7 Principles check in Step 4 Judge |
.agent/workflows/tfw-research.md |
Synced with source: dimensional analysis thread in Step 5 |
README.md |
Task board updated: Phase D TS + ONB links added, status โ ๐ข RF |
2. Key Decisions¶
-
15 terms, not 14. Coordinator confirmed that HL ยง4 deliverables list is the authoritative source and "Alternative" was omitted from TS AC-1 by oversight. Added as the 5th dimensional analysis term. Contract interpretation: TS AC-1 checklist count (14) was supplementary; HL deliverables list (15) takes precedence when user confirms the discrepancy.
-
Adapter sync = verbatim overwrite. Both source workflows and adapter files carry identical frontmatter (
---block withdescription:). Copied everything verbatim โ no transformation, no merge. Zero risk of missed content vs. a manual merge. -
Glossary section placement.
## Execution Gatesinserted after## Roles(before## RESEARCH) โ logical: execution gate terms apply to all roles.## Research โ Dimensional Analysisinserted after## Read-only AG(before## Phase) โ collocated with existing RESEARCH-related terms. TS ยง6 Technical Guidance suggestion followed. -
Definition style conformance. Each term: single paragraph, domain-neutral language,
โ file ยงNreference format. Zwicky / GMA / morphological terminology absent from all definitions per conventions.md ยง14.1.
3. Acceptance Criteria¶
AC-1: Glossary โ 15 terms (14 + Alternative)
- [x] Acceptance Criteria (TS) โ added to
## Execution Gates - [x] Technical Guidance โ added to
## Execution Gates - [x] Definition of Failure (TS) โ added to
## Execution Gates - [x] Principles Check โ added to
## Execution Gates - [x] AC Dependency Annotation โ added to
## Execution Gates - [x] Execution Loop โ added to
## Execution Gates - [x] Pre-TS Gate โ added to
## Execution Gates - [x] Pre-RF Gate โ added to
## Execution Gates - [x] Session Naming โ added to
## Execution Gates - [x] Phase Dependencies โ added to
## Execution Gates - [x] Dimension (Research) โ added to
## Research โ Dimensional Analysis - [x] Alternative (Research) โ added to
## Research โ Dimensional Analysis(coordinator-approved addition) - [x] Configuration Space (Research) โ added to
## Research โ Dimensional Analysis - [x] Consistency Check (Research) โ added to
## Research โ Dimensional Analysis - [x] Surviving Configuration (Research) โ added to
## Research โ Dimensional Analysis
Gate verified: glossary.md read after modification โ all 15 terms present, each has a concise definition.
AC-2: Adapter sync โ Antigravity workflows [depends: AC-1]
- [x]
tfw-handoff.mdcontent matches.tfw/workflows/handoff.md - [x]
tfw-plan.mdcontent matches.tfw/workflows/plan.md - [x]
tfw-review.mdcontent matches.tfw/workflows/review.md - [x]
tfw-research.mdcontent matches.tfw/workflows/research/base.md
Gate: each adapter was written via full overwrite from source content read in this session. No diff exists.
4. Verification¶
No build/lint commands defined for this task (pure markdown modifications).
Manual verification checklist:
- [x]
glossary.mdโ 15 terms counted, definitions do not use Zwicky/GMA/morphological terminology - [x]
glossary.mdโ all definitions useโ file ยงNreference format consistent with existing entries - [x]
glossary.mdโ two new H2 sections:## Execution Gates,## Research โ Dimensional Analysis - [x]
tfw-handoff.mdโ Step 0 present, Execution Loops present (Step 8), Pre-RF Gate present (Step 11), ONB answer protocol present (Step 5 callout), line count matches source (161) - [x]
tfw-plan.mdโ Step 0 present, Pre-TS Gate block present in Step 7 (3b), line count matches source (153) - [x]
tfw-review.mdโ Step 0 present, Step 1 = Select Review Mode (renumbered), HL ยง7 Principles check in Step 4, line count matches source (153) - [x]
tfw-research.mdโ dimensional analysis thread present in Step 5, line count matches source (131)
5. Observations (out-of-scope, not modified)¶
| # | File | Line(s) | Type | Description |
|---|---|---|---|---|
| 1 | .tfw/templates/research/briefing.md |
โ | todo | TS ยง6 notes "briefing.md doesn't reference Dimensions section" (Phase C RF ยง5 observation). Low priority โ dimensions are naturally discovered during Gather. If future work addresses this, the term "Dimension" is now in the glossary and can be referenced safely. |
6. Fact Candidates¶
| # | Category | Candidate | Source | Confidence |
|---|---|---|---|---|
| 1 | process | TS AC-1 checklist (14 terms) diverged from HL ยง4 deliverables list (15 terms, included "Alternative"). User resolved: HL deliverables list is authoritative when user confirms. Pattern: HL = vision, TS = spec; when they diverge, ask user before defaulting to TS. | User answer to ONB ยง3.1 | High |
| 2 | convention | "Alternative" term was the only missing link between Dimension and Configuration Space definitions. Without it, a reader of the glossary would understand that Dimensions have alternatives but couldn't find the term "Alternative" defined. Completeness of a term cluster matters. | This session, glossary analysis | Medium |
7. Strategic Insights (Execution)¶
No strategic insights. This was a documentation-only phase with no human domain knowledge injected beyond resolving the ONB question.
8. Diagrams¶
No diagrams. Phase D produced no architectural or flow changes โ pure text additions (glossary terms + adapter sync).
RF โ TFW-41 / Phase D: Glossary and Adapter Sync | 2026-04-20