TS — TFW-41 / Phase B: Workflow Gates

Date: 2026-04-20 Author: Coordinator (AI) Status: 🟡 TS_DRAFT — Awaiting approval Parent HL: HL-TFW-41


1. Objective

Add structural gates to TFW workflows: Pre-TS Gate (coordinator reads RF before writing TS), Pre-RF Gate (executor opens template before writing), Execution Loops (dependency-based self-check), coordinator ONB answer protocol, reviewer HL §7 principles check, and Session Naming Step 0. These gates prevent the systematic failures observed in HD-16/HD-18 at their source — during execution, not during review.

2. Scope

In Scope

  • Modify handoff.md — Pre-RF Gate, Execution Loops, coordinator ONB answer protocol
  • Modify plan.md — Pre-TS Gate
  • Modify review.md — HL §7 principles verification in Judge phase
  • Add Session Naming Step 0 to all 3 workflows

Out of Scope

  • Template changes (Phase A — done)
  • Research template changes (Phase C)
  • Glossary and adapter sync (Phase D)

3. Principles Check

# Principle (from HL §7) Enforced by Gate
P1 Gates over guidelines AC-1, AC-2, AC-3, AC-4, AC-5 Each AC adds a structural gate, not a textual suggestion
P2 Requirements, not implementation N/A Phase B modifies workflows, not TS template
P3 Verify against fact, not plan AC-2 Pre-TS Gate: read RF N-1 before writing TS N
P4 Enforce or remove AC-5 Judge verifies principles against AC
P5 Executor as engineer, not copier AC-3 Execution Loops force self-checking
P6 Domain-agnostic by default All ACs No domain-specific terminology in gate descriptions

4. Affected Files

File Action Description
.tfw/workflows/handoff.md MODIFY Add Pre-RF Gate, Execution Loops, ONB answer protocol, Session Naming
.tfw/workflows/plan.md MODIFY Add Pre-TS Gate, Session Naming
.tfw/workflows/review.md MODIFY Add HL §7 principles check in Judge, Session Naming

Budget: 0 new files, 3 modifications. Defaults: max 14 files, max 8 new, max 1200 LOC.

5. Acceptance Criteria

AC-1: Pre-RF Gate in handoff.md

Before the executor writes RF, they must open the RF template. This prevents writing from memory.

  • [ ] handoff.md Phase 3 has explicit step: "Open .tfw/templates/RF.md. Read all section headings. Then write RF following this structure."
  • [ ] Step is BEFORE "Create RF file" (current step 11) Gate: Read handoff.md → Pre-RF step exists before RF creation step

AC-2: Pre-TS Gate in plan.md

Before the coordinator writes TS for Phase N (where N > first phase), they must read the RF of the latest completed phase. Prevents plan≠fact drift.

  • [ ] plan.md Step 7 (Write TS) has sub-step for multi-phase: "Read RF of the latest completed phase. Verify: what was actually delivered? What deviated from plan?"
  • [ ] Sub-step is BEFORE "Write TS using templates/TS.md"
  • [ ] Explicitly says: "Read RF (actual output), not TS (planned output)" Gate: Read plan.md → Pre-TS sub-step exists in Step 7, references RF not TS

AC-3: Execution Loops in handoff.md [depends: AC-1]

When AC items in the TS have [depends: AC-X] annotations, the executor must verify each prerequisite AC before proceeding to its dependent.

  • [ ] handoff.md Phase 2 has Execution Loops instruction: "If TS §5 contains [depends: AC-X] annotations — verify prerequisite AC gate before starting dependent AC"
  • [ ] Instruction explains: "If AC-2 depends on AC-1, verify AC-1 gate passes before starting AC-2 implementation"
  • [ ] Instruction says: "Independent ACs (no [depends]) may be implemented in any order" Gate: Read handoff.md → Execution Loops instruction exists in Phase 2

AC-4: Coordinator ONB answer protocol in handoff.md

When the coordinator answers ONB questions and is uncertain, they must present options rather than deciding on behalf of the stakeholder.

  • [ ] handoff.md Phase 1 (or between Phase 1 and 2, where coordinator answers) has: "When answering ONB questions — if answer is not in HL/TS/KNOWLEDGE.md, present 2-3 options with tradeoffs. Do not decide on behalf of the stakeholder." Gate: Read handoff.md → ONB answer protocol exists

AC-5: HL §7 principles check in review.md Judge phase

Reviewer verifies that HL §7 principles survived into implementation. Each principle should be traceable: Principle → TS AC (via Principles Check table) → RF result.

  • [ ] review.md Step 3 (Judge) has checklist item: "HL §7 principles — read TS §3 Principles Check table. For each mapped principle: verify the linked AC was met in RF §3."
  • [ ] Instruction says: "If a principle was mapped to AC but AC failed → flag as principle violation, not just AC miss" Gate: Read review.md → Principles check exists in Judge step

AC-6: Session Naming Step 0 in all workflows

Every workflow starts with naming the session. Format: Role | Task-ID | Phase.

  • [ ] handoff.md has Step 0 before Context Loading: "Name this session: Executor | {TASK-ID} | Phase {X}"
  • [ ] plan.md has Step 0 before Step 1: "Name this session: Coordinator | {TASK-ID}"
  • [ ] review.md has Step 0 before Context Loading: "Name this session: Reviewer | {TASK-ID} | Phase {X}" Gate: Read all 3 workflows → each starts with Step 0 naming instruction

6. Technical Guidance

Reference material, not instructions. Executor MAY deviate with justification in RF.

  • handoff.md (148 lines): main insertion points are Phase 1 (ONB answer protocol), Phase 2 (Execution Loops), Phase 3 (Pre-RF Gate). Session Naming before Context Loading.
  • plan.md (146 lines): Pre-TS Gate goes into Step 7 (Write TS), specifically the multi-phase branch (Step 3b, line 124). Session Naming before Step 1.
  • review.md (145 lines): Principles check goes into Step 3 (Judge, line 81). Session Naming before Context Loading.
  • RF Phase A observation: no hardcoded section numbers in workflows — but check for references to "Detailed Steps" or "§4"/"§5 Acceptance Criteria" from old TS template and update if found.
  • Keep additions concise — workflows have an informal ~1200 word budget. Estimate: ~50-80 words total per workflow addition.
  • Session Naming format uses pipe | separator and {TASK-ID} placeholder for consistency.
  • Coordinator answers ONB questions in an ad-hoc process (between ONB and execution). In handoff.md the gap is between steps 5-6. Consider adding the protocol as a blockquote instruction in step 5 or as a new sub-step.

7. Definition of Failure

  • ❌ Any gate added as a "suggestion" or "recommendation" instead of a mandatory step → reject RF
  • ❌ Pre-TS Gate references reading "TS" instead of "RF" → defeats the purpose (plan≠fact)
  • ❌ Execution Loops triggered by AC count instead of [depends] annotation → wrong mechanism
  • ❌ Session Naming missing from any of the 3 workflows → reject RF

8. Phase Risks

Risk Mitigation
Workflow word count exceeds budget Additions are ~50-80 words per workflow. Existing workflows are within budget.
New steps disrupt workflow reading flow Gates are inserted at natural handoff points (before writing, between phases). Not adding new phases.
ONB answer protocol scope creep Protocol is one instruction, not a new workflow section

9. Cross-Phase Modifications (multi-phase only)

File Also modified in Coordination note
.tfw/conventions.md Phase A (anti-patterns), Phase C (terminology origin) Phase B does NOT modify conventions.md — but gates reference anti-patterns added in Phase A

Cross-references: HL-TFW-41 §4 Phase B, DR2 (Pre-TS Gate), DR3 (Execution Loops), D6 (Pre-RF Gate), D9 (ONB protocol), D10 (Judge principles), D11 (Session Naming). RF Phase A §2 Decision 5 (no hardcoded section numbers in workflows).


TS — TFW-41 / Phase B: Workflow Gates | 2026-04-20